Permit and site map
Starbase Louisiana
Tap a pin for details and the source. The orange line is SpaceX's proposed heavy-haul road; purple is separate state DOTD road work, not SpaceX's.
Loading the permit map…
Map geometry © OpenStreetMap contributors.
Locations from public filings and the plats filed with P20260653, P20260753 and P20260988; approximate where marked. Applications are not approvals. Statuses checked on SONRIS Nov 19, 4:30 PM CT.
Sources: SpaceX's Nov 9 revised filing narrative (central coordinates and end points for the main permit), the Nov 9 Canal Dredging Permit Set (MCA Central and East limits-of-disturbance vertex tables, sheets 10 and 12), the Nov 9 Roadway Permit Set Sheet 1 (heavy-haul road control points and segment lengths), the Nov 9 Inland Wharf Permit Set vicinity sheet (Inland Wharf East and turnaround-basin project-location callouts), Terracon's plat filed with P20260653 (20 soil-boring latitudes and longitudes, Figure 2), Raba Kistner's plat filed with P20260753 (19 test-pit latitudes and longitudes, Figure 3 table), the Nov 13 P20260988 CIPP lining alternative plat (Exhibit B coordinate table for 44 cross drains), the SONRIS applications (status, dates, applicants), OpenStreetMap (roads, Freshwater Bayou, the lock, towns), the USGS National Hydrography Dataset plus Census TIGER water data (shoreline, lakes, ponds, canals), and the FHWA 2025 National Bridge Inventory (Perry Bridge, structure 035701940707511). The shoreline is mapped data and may not show the newest erosion. The filing calls the east–west canal the Humble Canal; federal maps label it Dewitt Canal. The orange line is the proposed heavy-haul access road, drawn from the five NAD83 control points on Roadway Permit Set Sheet 1; Inland Wharf Road between intersections 1 and 3 is slightly simplified. Magenta open squares are canal and temporary-construction access ends from the Nov 9 narrative table (hidden until you turn on Dredging & access points). MCA West and building footprints are on the plan sheets but aren't outlined here: West has no vertex table, and the other sheets don't list corner coordinates in a form we can plot without guessing.
What changed
Nov 19, 2026
- P20260988 LA-82 Cross Drain Improvements (LADOTD, not SpaceX): status changed from Received – Under Review to Received – On Hold. Activity logged 11/19/2026 4:12 PM CT: On-Hold Pending Response by Submitter. On hold is not a denial.
- P20260988: a Letter of Inconsistency and a Request for Information were added to the permit file, both dated 11/19/2026.
- P20260988: new review comments from CPRA (no objection) and LDWF (nesting-bird precautions).
- P20260831 Southwest Louisiana Coastal Infrastructure Improvement Project (SpaceX): still Received – Under Review. Public notice date 11/21/2026. Written comments are accepted for 25 days after the notice runs in The Advocate; include CUP P20260831 and your full name and contact information. Anyone may request a public hearing.
- P20260831: new entries from COE (MVN-2026-00521, pending, Individual Permit), State Land (No Objection) and a SHPO notice, Nov 18–19.