Permit Tracker

Official state records. Review is not approval.

P20260831

Southwest Louisiana Coastal Infrastructure Improvement Project

SPACE EXPLORATION TECHNOLOGIES CORP. · Agent: DUPLANTIS DESIGN GROUP, PC

Parish
VERMILION
Filed
09/25/2026
Status
Received – Under Review
Application complete
YES
Public notice
11/21/2026

55days since filing

Official description

Proposed construction of a moderate-draft Gulf wharf on the Freshwater Bayou Channel south of the USACE Freshwater City Lock; and temporary laydown yard north of the locks; inland wharf components along existing navigation channels providing barge access to the federally maintained Freshwater Bayou and the Gulf Intracoastal Waterway (GIWW); maintenance access dredging of existing channels to support vessel access to the inland and Gulf wharf components, and an access road connecting regional highway networks to the Gulf wharf components. (See Attachment 1: Southwest Louisiana Infrastructure Improvement Project Narrative description for additional information)

Key dates

  • Application received09/25/2026
  • Application check09/25/2026
  • Acknowledged11/17/2026
  • Public notice11/21/2026
  • Distributed11/17/2026 08:53:52 CT · COE, STATE LANDS
  • Joint Public Notice document from the Office of Coastal Management added 11/18/2026.
  • On Notice activity logged 11/18/2026.
  • Comment period: 25 days from the public notice in The Advocate (set for 11/21/2026). Comments must include CUP P20260831 and the commenter's full name and contact information. Anyone may request a public hearing.
  • Comments go to the Office of Permitting and Compliance by mail, fax or email (P.O. Box 44487, Baton Rouge, LA 70804-4487); the reviewer's email is in the public notice.
  • Still under review, not approved.
Comments (18)
  1. 11/19/2026 12:00:55 CT

    COE

    COE#: MVN-2026-00521. Section: 10/404. PENDING. Individual Permit.

  2. 11/18/2026 21:15:48 CT

    Other · DCRT Section 106

    23524714 - EXTERNAL COMMENTS - SHPO Notice

  3. 11/18/2026 09:26:00 CT

    State Land

    No Objection.

  4. 11/18/2026 06:49:55 CT

    Other

    P20260831_Public_Request_For_Notice.pdf

  5. 11/17/2026 10:56:27 CT

    CPRA

    CUP# P20260831; With respect to its potential impact on the Pecan Island Terracing STATUS-Constructed, Project: ME-0014 - CWPPRA, CPRA has no objection at this time to the above referenced CUP application.

  6. 11/17/2026 10:50:05 CT

    CPRA

    CUP# P20260831; With respect to its potential impact on the Freshwater Bayou Bank Stabilization STATUS-Constructed, Project: ME-0013 - CWPPRA, CPRA has no objection at this time to the above referenced CUP application.

  7. 11/17/2026 10:49:57 CT

    CPRA

    CUP# P20260831; With respect to its potential impact on the Pecan Island Freshwater Introduction STATUS-Constructed, Project: ME-0001 - STATE, CPRA has no objection at this time to the above referenced CUP application.

  8. 11/17/2026 10:49:40 CT

    CPRA

    CUP# P20260831; With respect to its potential impact on the Freshwater Bayou Wetland Protection STATUS-Constructed, Project: ME-0004 - CWPPRA. Please address the existing shoreline protection along Freshwater Bayou where the DPEAC East dredge pipeline crosses it on its route from Booster Pumps 1 and 2 to MCA East. The shoreline protection is to be protected during the work and that any damage caused by the work is to be repaired and restored to its existing condition.

  9. 11/10/2026 11:15:27 CT

    Other · Martin O. Miller, II

    My October 02, 2026 comments have not been addressed as to continued access to our property south of roadway to be constructed in the filing made by Brad Hester dated 11/09/2026

  10. 11/10/2026 11:02:04 CT

    Other

    I still have not been added as an adjoining landowner for notification which I originally commented on 9/29/26

  11. 11/09/2026 20:19:28 CT

    Other · Brad Hester

    P20260813_RFI_Response_Letter_2026_11_09.pdf

  12. 10/27/2026 07:04:19 CT

    OPC/E

    OPC staff met with the applicant and agent on 10/26/2026 to discuss the Application Checklist information and project modifications.

  13. 10/12/2026 07:58:18 CT

    OPC/E

    OPC staff met with the applicant and agent on the following date to discuss the C&E Coastal Use Permit (CUP) process and review what information is needed in a CUP application.

  14. 10/12/2026 07:58:18 CT

    OPC/E

    OPC staff met with the applicant and agent on the following dates to provide further guidance and clarification on the documentation needed to complete the CUP application: October 7, 2026 October 8, 2026

  15. 10/02/2026 12:03:23 CT

    Other · Martin O. Miller, II

    Comments are made by the adjacent landowner to the South of the of the property subject to this CUP: We currently have a camp and cattle grazing lease on our Mulberry property and for the past 50+ years, through agreement with the Vermilion Corporation, surface lessee of the property subject to this CUP, we and our present cattle grazing lessee have accessed our property, including camp, grazing area and cattle pens, though a shell road off hwy 3147 located in Sections 14 and 23, T17S-R1E, as shown on the attached. I see no provision for continued access to our property during or after construction of Space X’s southern Roadway, shown as CR in APPENDIX A: OVERVIEW FIGURE 2 that has a date of filing, 09/25/2026 at 11:34:57 PM.

  16. 10/02/2026 12:03:21 CT

    Other · Martin O. Miller, II

    MulberryAccess.pdf

  17. 09/30/2026 11:26:05 CT

    Other · KIRK DAVIDSON

    P20260831_Public_Comment_9.30.2026.pdf

  18. 09/29/2026 08:45:40 CT

    Other · Martin O. Miller, II

    I am an adjoining landowner and have received no information on this permit.

Official record

P20260653

Related site investigation

Confidential Project - Pecan Island

TERRACON CONSULTANTS, INC.

Parish
VERMILION
Filed
08/03/2026
Status
Authorization Granted – Special Conditions
Application complete
YES
Public notice
NO PUBL NOTICE

106days since filing

Official description

Proposal to complete twenty-five (25) geotechnical boring surveys. Approximately 13.81 cy of material will be excavated and hauled offsite and 13.81 cy of bentonite grout slurry will be used as fill.

Key dates

  • Application received08/03/2026
  • Application check08/03/2026
  • Acknowledged08/06/2026
  • Issued08/17/2026
  • Commence08/17/2026
  • Process08/17/2026
  • Distributed09/07/2026 11:19:54 CT · DEQ
  • Distributed09/02/2026 11:16:41 CT · DEQ, COE
  • Distributed09/02/2026 06:28:38 CT · COE
  • Distributed08/17/2026 10:39:54 CT · DEQ
  • Distributed08/12/2026 10:30:09 CT · DEQ, COE
  • Distributed08/07/2026 11:28:48 CT · DEQ, COE, STATE LANDS
  • Distributed08/06/2026 16:45:27 CT · COE, STATE LANDS
  • Permit issuance09/03/2026 15:46:03 CT · OCM
  • Permit issuance08/17/2026 08:32:18 CT · OCM
Comments (31)
  1. 09/03/2026 15:46:04 CT

    Other · CAPTURE

    23430118 - OUTGOING CORRESPONDENCE - P20260653 - Processing Complete

  2. 09/03/2026 14:53:42 CT

    DCE · OCM

    COMMENCE DATE 08/17/2026 ENTERED

  3. 09/03/2026 12:20:31 CT

    DCE

    P20260653 - Impact Calculations - 1945.Amendment_1.docx

  4. 09/03/2026 09:00:49 CT

    OPC/E

    The proposed project is anticipated to have temporary impacts upon marsh habitat within the Marsh Management Plans permitted under P19840637, P19850463, and P19880250 that will be subject to a growing season condition as per the DCE Field Biologist, but is not anticipated to have any adverse impacts upon their function/features or upon the Mitigation Projects permitted under P19981033, P20030801, P20060927, and P20100628.

  5. 09/02/2026 11:48:25 CT

    DCE

    Previous comment remains the same.

  6. 09/02/2026 09:58:53 CT

    DCE

    The proposed project will temporarily impact emergent marsh (E2EM1P5). A growing season condition is recommended.

  7. 09/02/2026 09:13:53 CT

    OPC/E

    The proposed project is anticipated to have temporary impacts upon marsh habitat within the Marsh Management Plans permitted under P19840637, P19850463, P19880250, and P20001379 that will be subject to a growing season condition as per the DCE Field Biologist, but is not anticipated to have any adverse impacts upon their function/features or upon the Mitigation Projects permitted under P19981033, P20030801, and P20100628.

  8. 09/02/2026 07:53:21 CT

    CPRA

    CUP# P20260653: With respect to its potential impact on CRM0576, (CRMS program) has NO OBJECTION at this time and is requesting a 10 meter (32 ft.) buffer zone around sampling areas surrounding the CRMS0576-H01 (-92° 28' 50.032" 29° 35' 28.953"). Please note that normal transportation along the bayou is acceptable, but CPRA (CRMS Program) should be notified at the start and completion of work in the immediate area of the CRMS site. CPRA (CRMS Program) will also request a 10-meter (32 ft.) NO ACCESS buffer zone surrounding the immediate boardwalk location CRMS0576-E01 (-92° 28' 48.911" 29° 35' 28.444") must be observed. In this NO ACCESS buffer zone, no foot and/or boat traffic is acceptable. The measurements taken at the boardwalk are at the millimeter scale, and footprints around it will necessitate its replacement. If the field crews enter either buffer zones CPRA (CRMS personnel) must be informed of the date and time that the field crews are within the buffer zones.. Should any damages occur to the sampling stations, the permit holder may be responsible for the monetary costs involving lost data and the removal and rebuilding of the CRMS station..

  9. 09/02/2026 07:09:10 CT

    CPRA

    CUP# P20260653; With respect to its potential impact on the Pecan Island Freshwater Introduction STATUS-Constructed, Project: ME-0001 - STATE, CPRA has no objection at this time to the above referenced CUP application.

  10. 09/02/2026 07:05:49 CT

    OPC/E

    HMIA Level 0: Modifications result in no evident alteration of existing hydrology or water quality.

  11. 09/01/2026 13:12:25 CT

    DCE · OCM

    COMMENCE DATE 08/17/2026 ENTERED

  12. 09/01/2026 10:02:11 CT

    DCE · OCM

    COMMENCE DATE 08/17/2026 ENTERED

  13. 09/01/2026 10:01:19 CT

    DCE · OCM

    COMMENCE DATE 08/17/2026 ENTERED

  14. 09/01/2026 09:09:08 CT

    COE

    COE#: MVN-2026-00551-WB. PENDING.

  15. 08/18/2026 12:35:15 CT

    DCE · OCM

    COMMENCE DATE 08/17/2026 ENTERED

  16. 08/17/2026 08:32:19 CT

    Other · CAPTURE

    23407548 - OUTGOING CORRESPONDENCE - P20260653 - Processing Complete

  17. 08/13/2026 07:48:46 CT

    Other · JAZE RABALAIS

    P20260653_Comment_Response.pdf

  18. 08/12/2026 14:57:13 CT

    DCE

    P20260653 - Impact Calculations - 1900.docx

  19. 08/12/2026 14:39:35 CT

    DCE

    P20260653 - Impact Calculations - 1890.docx

  20. 08/12/2026 10:37:00 CT

    CPRA

    CUP# P20260653; With respect to its potential impact on the Pecan Island Freshwater Introduction STATUS-Constructed, Project: ME-0001 - STATE, CPRA has no objection at this time to the above referenced CUP application.

  21. 08/11/2026 14:45:45 CT

    Other · JAZE RABALAIS

    P20260653_RFI_Response_8.7.2026.pdf

  22. 08/11/2026 08:27:14 CT

    State Land

    No Objection to soil borings.

  23. 08/10/2026 10:25:40 CT

    Other · Martin O. Miller, II

    Review of Current filing dated 8/7/26 now indicates bore holes B-11 and B-12 are on my co-owned property in the name of Martin O. Miller, II, LLC. Access to Bore hole B-24 along the beach and through Sections 21 and 22 is property co-owned by my LLC. No one has contacted me or my other co-owners that I have spoken with for permission to enter our property, which is a violation of our private property rights. In addition, I still have not been notified of this permit as required.

  24. 08/10/2026 10:25:39 CT

    Other · Martin O. Miller, II

    SpaceXsoilboringsf.pdf

  25. 08/07/2026 11:50:25 CT

    CPRA

    CUP# P20260653; With respect to its potential impact on the Pecan Island Freshwater Introduction STATUS-Constructed, Project: ME-0001 - STATE, CPRA has no objection at this time to the above referenced CUP application.

  26. 08/07/2026 11:43:08 CT

    Other · Martin O. Miller, II

    Bore holes B-11 and B-12 appear to be on my co-owned property in the name of Martin O. Miller, II, LLC. Access to Bore hole B-24 along the beach is property co-owned by my LLC. No one has contacted me or other adjacent landowners for permission to enter our property nor have I or other owner adjacent landowners to Exxon property been notified of this permit as required.

  27. 08/07/2026 11:36:11 CT

    OPC/E

    The proposed project is anticipated to have temporary impacts upon marsh habitat within the Marsh Management Plans permitted under P19840637, P19880250, and P19850463 that will be subject to a growing season condition as per the DCE Field Biologist, but is not anticipated to have any adverse impacts upon their function/features or upon the Mitigation Projects permitted under P19981033, P19981776, P20030801, and P20100628.

  28. 08/07/2026 11:32:46 CT

    DCE

    The proposed project will temporarily impact emergent marsh (E2EM1P5). A growing season condition is recommended.

  29. 08/07/2026 08:05:57 CT

    OPC/E

    HMIA Level 0: Modifications result in no evident alteration of existing hydrology or water quality.

  30. 08/07/2026 07:52:58 CT

    CPRA

    CUP# P20260653; With respect to its potential impact on the Pecan Island Freshwater Introduction STATUS-Constructed, Project: ME-0001 - STATE, CPRA has no objection at this time to the above referenced CUP application.

  31. 08/07/2026 05:45:04 CT

    OPC/E

    P20260653_Application_Checklist_Assistance_8.5.2026.pdf

Official record

P20260753

Related site investigation

SpaceX Starbase - Louisiana Investigation

RABA KISTNER, INC.

Parish
VERMILION
Filed
09/01/2026
Status
Authorization Granted – Special Conditions
Application complete
YES
Public notice
NO PUBL NOTICE

77days since filing

Official description

Geotechnical investigation will comprise excavating and sampling 19 test pits for classification testing and analysis, which will require ~106cy in total excavation (with ~2cy being taken off-site for analysis) and ~2cy of sand fill.

Key dates

  • Application received09/01/2026
  • Application check09/01/2026
  • Acknowledged09/11/2026
  • Issued09/14/2026
  • Process09/14/2026
  • Distributed09/16/2026 11:29:54 CT · DEQ
  • Distributed09/11/2026 11:23:28 CT · COE
  • Permit issuance09/14/2026 14:53:08 CT · OCM
Comments (9)
  1. 09/24/2026 11:08:05 CT

    COE

    COE#: MVN-2026-00628-WAD. PENDING.

  2. 09/14/2026 14:53:09 CT

    Other · CAPTURE

    23441990 - OUTGOING CORRESPONDENCE - P20260753 - Processing Complete

  3. 09/14/2026 11:17:05 CT

    DCE

    P20260753 - Impact Calculations - 1974.docx

  4. 09/14/2026 11:01:41 CT

    DCE

    Hydrologic Modification Impact Analysis - For the components of the proposed project that occur in open water, there will be no changes to surface water runoff or water quality. No adverse impacts to adjacent lands and/or waterways will occur as a result of open water activities. For the remainder of the proposed project, the vegetated cover impacted during access tracking and geotechnical digging will likely recover after a complete growing season resulting in no changes to surface water runoff or water quality post-construction.

  5. 09/14/2026 10:13:06 CT

    OPC/E

    The proposed project is anticipated to have temporary impacts upon marsh habitat within the Marsh Management Plans permitted under P19850463 and P19880250 which will be subject to a growing season condition as per the DCE Field Biologist but is not anticipated to have any adverse impacts upon their function or features or upon the Marsh Management Plan permitted under P19840637 or the Mitigation Projects permitted under P19971794, P19981033, P19990340, P20030801, P20060927, and P20100628.

  6. 09/11/2026 14:49:17 CT

    DCE

    Temporary impacts to emergent wetlands (E2EM1P5) and open water/water bottom (E1UBL5) may occur as a result of the project. A growing season condition is recommended for the activity.

  7. 09/11/2026 13:56:53 CT

    CPRA

    CUP# P20260753; With respect to its potential impact on Station ID:CRMS0576 CUP# P 20260753: With respect to its potential impact on CRM0576, (CRMS program) has NO OBJECTION at this time and is requesting a 10 meter (32 ft.) buffer zone around sampling areas surrounding the CRMS0576-H01 (-92° 28' 50.032" 29° 35' 28.953"). Please note that normal transportation along the bayou is acceptable, but CPRA (CRMS Program) should be notified at the start and completion of work in the immediate area of the CRMS site. CPRA (CRMS Program) will also request a 10-meter (32 ft.) NO ACCESS buffer zone surrounding the immediate boardwalk location CRMS0576-E01 (-92° 28' 48.911" 29° 35' 28.444") must be observed. In this NO ACCESS buffer zone, no foot and/or boat traffic is acceptable. The measurements taken at the boardwalk are at the millimeter scale, and footprints around it will necessitate its replacement. If the field crews enter either buffer zones CPRA (CRMS personnel) must be informed of the date and time that the field crews are within the buffer zones.. Should any damages occur to the sampling stations, the permit holder may be responsible for the monetary costs involving lost data and the removal and rebuilding of the CRMS station..

  8. 09/11/2026 11:48:32 CT

    CPRA

    CUP# P20260753; With respect to its potential impact on the Pecan Island Freshwater Introduction STATUS-Constructed, Project: ME-0001 - STATE, CPRA has no objection at this time to the above referenced CUP application.

  9. 09/11/2026 10:35:19 CT

    DCE

    P20260753_compiled-communications_plats-discussion_9.11.26.pdf

Official record

P20260988

Related road work, LA 82

LA-82 Cross Drain Improvements

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT · Agent: ROYAL ENGINEERS AND CONSULTANTS, LLC

Parish
VERMILION
Filed
11/13/2026
Status
Received – On Hold
Application complete
YES
Public notice
—

6days since filing

Official description

LADOTD plans to rehabilitate or replace in-kind 44 existing 36 inch metal cross-drain pipes along LA-82 between LA-3147 and LA-35. These structures were originally constructed in 1949 and have exceeded their useful service life. Approximately 36 of the 44 cross drains are believed to be candidates for in-place rehabilitation using cured-in-place pipe (CIPP) lining, which does not materially alter the hydraulic capacity of the existing pipe. Approximately 8 crossings are believed to be collapsed and will be removed and replaced with pipe of the same size.

Key dates

  • Application received11/13/2026
  • Application check11/13/2026
  • Acknowledged11/18/2026
  • On hold11/19/2026 4:12 PM CT · On-Hold Pending Response by Submitter
  • Received – On Hold since 11/19/2026: On-Hold Pending Response by Submitter. On hold is not a denial.
  • Letter of Inconsistency and Request for Information added to the file 11/19/2026.
Comments (3)
  1. 11/19/2026 09:14:37 CT

    LDWF

    WDP comments: The Wildlife Diversity Program indicates the possible presence of Waterbird Nesting Colonies near the project area. Please be aware that entry into or disturbance of active breeding colonies is prohibited by the Louisiana Department of Wildlife and Fisheries (LDWF). In addition, LDWF prohibits work within a certain radius of an active nesting colony. […] To minimize disturbance to colonial nesting birds, the following restrictions on activity should be observed: - For colonies containing nesting wading birds (e.g., herons, egrets, night-herons, ibis, Roseate Spoonbills) or Anhingas or cormorants, all project activity occurring within 1000 feet of an active nesting colony should be restricted to the non-nesting period (i.e., September 1 through February 15). - For colonies containing nesting gulls, terns, or Black Skimmers, all project activity occurring within 650 feet (2000 feet for Brown Pelicans) of an active nesting colony should be restricted to the non-nesting period (i.e., September 16 through April 1). […] No other impacts to rare, threatened or endangered species or critical habitats are anticipated from the proposed project. (Excerpt. The full comment, including nesting-survey steps, is on the official record.)

  2. 11/19/2026 07:00:05 CT

    CPRA

    CUP# P20260988; With respect to its potential impact on the Freshwater Bayou Wetland Protection STATUS-Constructed, Project: ME-0004 - CWPPRA, CPRA has no objection at this time to the above referenced CUP application.

  3. 11/18/2026 13:15:59 CT

    OPC/G

    P20260988_HMIA_Not_Required.pdf

Official record

How the review works

This is a status tracker, not legal advice. A status of Under Review or a complete application is review, not approval.

  1. State law says the application is sent to the parish government and "all appropriate state and local agencies." There is no set list or cap in that statute.

    La. R.S. 49:214.30 ↗

  2. After public notice in the official journal (The Advocate), the rules provide a 25-day period for written public comment.

    LAC 43:I.723

  3. The decision is due 30 days after the public notice or 15 days after a public hearing, whichever is later.

    LAC 43:I.723

  4. OCM says a full review takes at least 45 days.

    OCM FAQ ↗

What changed

Nov 19, 2026